PHASE 02 ยท DOCUMENTATION

Documentation.
Requirements everyone signs, before anyone designs.

You arrive with an idea, a feasibility study or a feature list. You leave with a complete, traceable set of documents that your team and every supplier can build and test against.

Henrik Andersen development loop: enter anywhere, stay as long as you need, exit anytime

At a glance.

You bring
  • A product idea or a feasibility study
  • A feature list or customer wishes
  • The standards your market requires
  • Or existing documents to review
I do
  • Customer and system requirements
  • System specification
  • Architecture and interface documents
  • Test planning and traceability
You get
  • CRD, SSD and SRD
  • SAD, SDD and ICD
  • Verification & validation plan
  • Traceability matrix

What is included.

Ten building blocks. Take them all, or just the ones you need.

HOW EACH STAGE IS APPROVED

Design reviews and decision gates.

At the end of each stage, a review establishes whether the evidence supports moving on to the next one. You see the evidence, the findings and the decision, and the next stage starts only with your approval.

Design reviews and decision gates. Top: six development stages, idea, specification, design, prototype, verification and production, separated by five gates: feasibility review, requirements review, design review, test readiness and production readiness. Middle: inside every gate, evidence (requirements met, test and analysis results, open risks and issues, cost and schedule) is reviewed against agreed criteria, leading to go, go with actions, or rework and review again. Below: review principles, agreed criteria, evidence not opinion, every finding tracked, and you decide. Right: the typical outputs, review records, actions and approved baselines.

What you get.

CRD Customer Requirement Document
SSD + SRD System specification and requirements
SAD + SDD Architecture and development
ICD Interface Control Document
HRS + SWRS Hardware and software requirements
VVP + RTM Test plan and traceability
Duration

Agreed in your proposal

Enter with

A product idea or a feasibility study

Exit with

A buildable specification

Payment

After your approval

Where to next.

Continue with me through the next phases to start of production, or leave with what you came for.

Previous phase01 IdeaFeasibility, proof of concept, cost and risk. Next phase03 ArchitectureHW / SW partitioning and the choice of key components.

CONTACT

Ready to start at phase 02?
Or hand over the complete development? Just ask.

A new product to develop from scratch, a design that needs a second look, or a prototype that does not work yet: a few lines are enough to start.

  • A personal reply within one working day
  • No cost and no commitment up front: you only pay for work you approve
  • Your idea stays confidential, NDA on request (how I keep your project confidential)

Write to me

info@siliconmeetscode.com
Write an email

Helpful to mention: what the product does, where it is today, and your timeline. The email opens with these questions ready to fill in.

Working from Belgium and Germany with clients across Europe and Asia